Track

Summer Yard Work

Switch-Kat

Once upon a time, Dave built some T-Trak modules. He spread a pair of passing sidings across several of them, and called them “the yard modules.” Those modules proved incredibly useful, and were included in every show layout. When Dave took a break from the hobby, Dana got the yard modules, and they went to so many shows that their foam-over-flakeboard carcases got all beat up. I built new carcases from oak-veneer plywood, and Dana and I installed the old track on them. They continued to go to every show. When Dana stepped back from his train-show activities, I got the yard modules, and here our story begins. (more…)

Complex Interactions of Wheel and Rail

Broadway_closeup_906Another fall show season has come and gone so quickly! After spearheading the 12-table T-Trak layout at the Syracuse show, I helped with smaller layouts at Batavia, The TTCS Eagle show, and the Rochester Mini Maker Faire, before coordinating a 4-table T-Trak layout at the RIT show. No two layouts were alike; modular layouts never are. Each had its challenges to be met. The Syracuse layout, in particular, presented several situations where mechanical issues required finessing, in order to keep trains on track, together, and rolling.

(more…)